Installation
Can You Put a Metal Roof Over Shingles in Ontario?
Going over existing shingles saves real money and can improve the roof. It can also hide a rotting deck. Here is exactly how to tell which situation you are in.
Re-roofing
Many of the metal roofs we install replace a worn-out asphalt roof. Here is how the decision gets made, what happens on each day, and what changes at every detail on the way.
The short answer
Replacing an asphalt roof with a standing seam metal roof usually takes 3 to 6 working days on site, and the first decision is whether to tear off the shingles or strap over them, which only works over one sound layer on dry, flat roof boards. CGD Roofing, based in Barrie, inspects the attic and the roof before quoting, forms the panels on your driveway, and does this work across Simcoe County, Muskoka, Grey Bruce, the Kawarthas and York Region. You get a written specification before you commit, never a price over the phone.
There are two ways to replace shingles with a metal roof. A tear-off strips the asphalt down to the roof boards, repairs or replaces any boards that are soft, and builds the new roof from there. A strap-over leaves one layer of shingles in place, fixes horizontal strapping through them into the structure, and installs the panels on that strapping, which leaves a ventilated air space under the metal. That strapped assembly is our Gold package, and on the right house it is the better roof, not the budget one.
The right house means one layer of shingles, roof boards that are dry and solid everywhere, no history of moisture in the attic, and roof planes that are reasonably true. Two layers, a soft spot underfoot, staining on the underside of the boards or a visible sag all mean a tear-off. We make that call from evidence gathered on your roof and in your attic, and the quote says what we found. If the evidence points to the more expensive option, that is what the quote will say.
A replacement quote is only as good as the inspection behind it. Before we price anything we look at the parts of the house the new roof will depend on, using a drone survey, a walk of the roof where it is safe, and a look in the attic.
Day one is set-up and protection. Bins and the roll former go on the driveway, tarps go over gardens and against the walls, and work starts on the first planes. On a tear-off, a careful contractor only opens as much roof as can be dried in with underlayment that same day. On a strap-over, the strapping and underlayment go down plane by plane instead.
The middle days are the roof itself. Eave trim and drip edge go on first, valleys are built before the panels that meet them, and panels are formed on site to the exact length of each slope, one continuous piece from ridge to eave. Chimney, wall and skylight flashings are bent on our brake as each one is reached rather than ordered from a catalogue.
The last day is ridge, final trim, snow retention where it was specified, and cleanup, including a magnet sweep of the lawn, beds and driveway. Simple roofs land at the short end of the range. Steep pitches, lots of dormers and valleys, a tear-off with board replacement, or a run of bad weather push toward the long end.
Shingles and metal handle details differently, and a replacement is where most of the long-term quality is won or lost. Every existing flashing is replaced rather than reused.
A new metal roof does not cure an ice dam caused by heat escaping into the attic. Ice dams form when warm air melts snow higher up the slope and the water refreezes at the cold eave. Metal helps because snow slides sooner, but the cause is usually blocked soffits, missing baffles, bathroom fans venting into the attic, or gaps around light fixtures and the attic hatch.
A replacement is the one time the eaves are fully open, so it is the time to restore intake, fit baffles where insulation has slumped into the soffit, and install a ridge vent that matches. High-temperature ice and water membrane goes at the eaves and valleys, and on our Gold package it runs past the code minimum. If the attic tells us the problem is air sealing inside the house, we will say so, because that part is not a roofing job.
Not every replacement starts with shingles. A lot of houses and cottages around Simcoe County and Muskoka carry screw-down metal from decades ago that has reached its second or third round of leaking washers. Sometimes a re-screw is still the right answer, and our metal roof repair page covers that. When the panels are rusting through, the laps leak on a shallow pitch, or the roof has been re-screwed before and the holes are worn out, replacement makes more sense.
In most cases the old ribbed panels come off. They do not give a flat plane to build on, and the fastener holes and any rust underneath need to be seen. Many older screw-down roofs were fixed to strapping with no solid boards at all, so the replacement often starts with new sheathing before the underlayment and standing seam go on.
Whether a re-roof needs a building permit depends on the municipality and on what is changing. Replacing a covering like for like is often treated differently from replacing roof boards, altering structure or changing the roof shape, and the rules are not the same in every town we work in. Call the building department before work starts. If the house has a heritage designation or sits in a heritage district, speak to the heritage planner as well, since material and colour can be part of that conversation. Your insurer will also want to know the roof has been replaced, so keep the specification and the final invoice together.
Three levels of assembly, quoted from a measured survey, never a rate card. We will tell you which one your building needs, including when that is the simplest one.
Direct installation
Panels formed on site and installed over sound existing roof boards. The straightforward option when the structure underneath is already in good shape.
Best for: Sound decks, simple rooflines, budget-led projects
Quote the Silver systemStrapped & ventilated
Adds a strapped substrate that creates a ventilated cavity under the panel, the assembly that actually addresses ice damming rather than hiding it.
Best for: Most Ontario homes. The one we would put on our own houses
Quote the Gold systemArchitectural grade
Full architectural detailing in 24 gauge with a PVDF finish. For heritage homes, custom builds, and anything where the roof is a design element.
Best for: Chalets, heritage homes, complex or highly visible rooflines
Quote the Platinum systemEvery project is quoted from a site visit or drone survey, roof complexity, tear-off versus overlay, gauge, finish and access all move the number, and none of them can be assessed from a postcode.
A typical house re-roof with standing seam metal takes 3 to 6 working days on site. A simple gable roof strapped over one layer of shingles sits at the short end. Steep pitches, many dormers and valleys, a full tear-off with replacement of soft roof boards, or poor weather push it toward the long end.
Only over one layer of shingles on roof boards that are dry, solid and reasonably flat, with no sign of moisture in the attic. In that case strapping is fixed through the shingles and the metal goes on the strapping, creating a ventilated air space. Two layers, soft spots, attic staining or a sagging plane all mean the shingles should come off first.
It depends on the municipality and the scope of work. Replacing a roof covering is often treated differently from replacing roof boards or changing the structure, and requirements vary from town to town. Check with your local building department before work starts, and with the heritage planner if the property is designated.
It helps, because snow slides off metal sooner, but it does not fix the cause. Ice dams come from heat escaping into the attic and melting snow that refreezes at the eave. The lasting fix is open soffit intake, a matching ridge vent, high-temperature membrane at the eaves, and air sealing inside the house where warm air is leaking into the attic.
Yes. The old exposed-fastener panels usually come off so the condition underneath can be checked. Older screw-down roofs were often fastened to strapping with no solid boards, so new sheathing may go on before the underlayment and the standing seam panels.
It depends on the measured roof area, pitch, complexity, tear-off versus strap-over, gauge, finish and access. CGD Roofing does not quote from a phone call or publish a rate. The cost guides on our blog explain what drives the price, the online range tool on the quote page gives a whole-project range in about 90 seconds, and a site visit or drone survey produces a written, measured quote.
Installation
Going over existing shingles saves real money and can improve the roof. It can also hide a rotting deck. Here is exactly how to tell which situation you are in.
Comparisons
Asphalt is cheaper today, metal is cheaper by year 22. The real Ontario cost comparison, the shingle lifespan nobody advertises, and when asphalt wins.
Cost & Value
What actually drives the cost of a standing seam roof in Ontario: geometry, tear-off, gauge, finish and access, plus what a real quote must include.
We quote from measured drawings or a drone survey, never from a phone call. Tell us where you are and what you have, and we will tell you honestly whether we are the right fit.
The online range takes about 90 seconds and no phone call.
Free estimates · Licensed & insured · Serving Ontario from Barrie